top of page
mangfac_logo2.png

Study and Installation of Low and Medium Voltage

Estudio_tensiones.png

Load Flow Studies

These are of great importance in planning and designing future expansion of electrical systems, as well as in determining better operating conditions for existing systems.

Calibration of Protection Systems

relevador.png

The main purpose is to accurately adjust the protections for correct operation.

multimetro.png
prueba tablero1.png
IMG-20220827-WA0005.jpg

Pre-operative tests of low and medium voltage boards

Set of tests carried out on power cabinets before commissioning in order to prevent failures.

Insulation resistance tests on low, medium and high voltage equipment

Imagen de WhatsApp 2023-05-15 a las 16.2
Imagen de WhatsApp 2023-05-15 a las 16.2

The main purpose is to verify the insulation of transformers that they comply with the minimum bearable resistance under operation to which they will be subjected.

Imagen de WhatsApp 2023-05-15 a las 16.2
Imagen de WhatsApp 2023-05-15 a las 16.2
Imagen de WhatsApp 2023-05-15 a las 16.23.172.jpg

Design, installation and maintenance of the lightning rod system and ground network, power quality study.

As well as predictive, preventive and corrective maintenance to meet the highest standards.

Design and installation of low voltage electrical systems, channeling (assembly of conduit, tray, and electroduct), design of lighting and energy saving systems.

From design to start-up, monitoring of work under current regulations, consultancies, plans and engineering; in order to provide the customer with the highest possible quality.

planos.png
IMG-20220827-WA0021.jpg
charola.png

request a quote

bottom of page